Khalili and Associates Consultant Engineers
About Us Services Projects Contact us

Projects / Ongoing ::

- Utilities Supply for TetraPak (TetraPak A3/Flex iLine)
- Milk products filling lines
- DANONE Yogurt Filling Lines Ghazvin, Iran

 Scope of Work

Design, engineering and implementation of:

  • All mechanical and electrical facilities
  • Power distribution networks & industrial lighting
  • Water treatment Chlorination , Ozonisation Provision
  • Pressurized Raw Water Supply System 70 M3/Hr 4 Bar
  • Chilled water supply System 80 M3/Hr, 4~7c, 4Bar
  • Pure Water Supply System 30 M3/ Hr, TDS<10 PPM, 4 Bar
  • Cooling Water Supply System , 400 M3/Hr , 25~35c
  • Automation & control systems for water treatment facilities: raw, chilled, pure, cooling and waste water.
  • Steam and water piping systems and pumping station
  • Compressed Air Supply Station 7.5 Bar, 5 M3/Hr, Micro filtered down to 0.01 Micron, Water and Oil Separated
  • 12", 8", 6", 5", 4" and 2" Stainless Steal Overhead Piping for Above Supplies
  • 5", 4", 2" Polyethylene Underground Piping through out the site for Above Supplies
  • Design and Pressure Simulation And Super vision of construction of SS Pressure vessels
 Responsibilities and Tasks
  • Estimate & forecast of project execution expenses
  • Project feasibility study
  • Engineering Calculation and Design
  • Supervision of Procurement
  • Selection of Contractors and Installation Coordination
  • Site supervision of Installations and Startup
 Project Duration 1 1/2 Years
 Project Initiation Sep 2009
 Project Completion Mar 2011
 Project Cost 2 Million USD
 Project location Sahar Dairy Processing Plant, Ghazvin, Iran

All Rights Reserved © 2006
Designed by BlendMedia.ca